New doors and drawer fronts are the visible replacement components used in cabinet refacing. You can usually keep the cabinet boxes when they are sound, dry, securely installed and part of a functional layout. The practical challenge is coordinating the new fronts with the existing openings, hinges, drawer boxes, panels and hardware. Related reading: A Practical Guide to Custom Shower Doors Edmonton.
This guide focuses on the details that affect a successful order and quote: checking the boxes, choosing compatible fronts, measuring doors and drawers, identifying false fronts and damaged components, and defining the complete scope before work begins.
What New Doors and Drawer Fronts Actually Change
Cabinet doors cover the openings in upper and lower cabinets. Drawer fronts are the visible panels attached to drawer boxes or, in some designs, mounted over a fixed false front. Cabinet boxes are the structural units behind them, including the sides, shelves, bottoms and interior framing.
Replacing the doors and drawer fronts changes the kitchen’s visible style while retaining suitable boxes and the existing layout. This is the central idea behind cabinet refacing.
Refinishing takes a different approach. It keeps suitable existing doors and drawer fronts, then renews their surface with a new finish. Refacing replaces those visible components when you want a different profile, cleaner fronts or a broader style change. For this type of project, the key question is not simply which finish you prefer. It is whether the new components will work with the cabinet openings and the parts behind them.
Define the Front-Replacement Scope Before You Order
Start by separating the visible pieces from the supporting parts. A quote or order should show whether it includes doors, drawer fronts, end panels, fillers, toe kicks, valances, hardware and any repairs to the boxes or drawer assemblies.
- New doors: Count upper, base, corner, pantry and appliance doors separately.
- New drawer fronts: Record working drawers and false fronts as different configurations.
- Coordinated panels: Include exposed ends, fillers and trim if the new fronts will make them look dated by comparison.
- Hardware: Identify handles, knobs, hinges and runners that will be reused or replaced.
- Repairs: List swollen boxes, loose runners, damaged shelves, poor alignment and moisture-affected areas.
This scope prevents a common mistake: pricing the doors and drawer fronts while leaving the visible panels, installation or damaged drawer boxes outside the work.
Are Your Cabinet Boxes Suitable to Keep?
New fronts cannot compensate for a cabinet box that is unstable, swollen or poorly positioned. Refacing is most appropriate when the boxes are structurally sound, securely installed and part of a layout that provides useful storage and workable clearances.
Use this inspection checklist
- Structure: Look for loose joints, sagging shelves, split panels or boxes that move when doors open.
- Moisture: Check beneath the sink and near dishwashers for swelling, soft board, staining or water damage.
- Attachment: Confirm that the boxes are firmly secured to the wall or adjacent units.
- Layout: Decide whether the cabinet arrangement, appliances and work areas already function well.
- Clearances: Check that doors and drawers can open without hitting walls, appliances, handles or one another.
- Visible surfaces: Identify end panels, fillers, toe kicks and trim that must coordinate with the new fronts.
- Interior function: Note damaged shelves, failing runners or storage limitations that a new front will not solve.
A kitchen with dated doors but solid, dry boxes is often a good refacing candidate. Water-damaged boxes, inadequate storage or a failing layout require a broader assessment before new fronts are ordered.
Choose a Door Style That Works With the Existing Kitchen
Common door descriptions include Shaker, flat-panel, raised-panel and slab. The style affects the visual character of the kitchen, but the opening dimensions, overlay and hinge position determine whether a particular front can be installed correctly.
- Shaker: A framed, recessed-panel look with clean lines. It suits kitchens moving toward a simple, transitional appearance.
- Flat-panel: A relatively plain front with less visual detailing than a raised or framed panel.
- Raised-panel: A more traditional profile with a raised centre panel and stronger decorative detail.
- Slab: A single flat face without a frame or centre panel, often chosen for a modern, minimal look.
Drawer fronts should repeat the same visual logic as the doors. A framed door paired with an unrelated slab drawer front can make the installation look pieced together, even when the colour is identical.
Also review the surrounding pieces. End panels, fillers, valances and toe kicks may need a matching finish or treatment so the new fronts do not appear isolated from the rest of the cabinetry.
Do Not Measure Only the Cabinet Doors
Useful project information includes more than the width and height of each front. A professional can verify measurements, but a prepared first request helps identify the scope and reduce surprises.
| Record | What to note |
|---|---|
| Component count | Doors, drawer fronts, end panels, fillers and other visible pieces. |
| Opening dimensions | Width and height of each opening, especially where sizes vary. |
| Front dimensions | Width, height and approximate thickness of each existing piece. |
| Overlay | How far each door sits over the frame or opening. |
| Hinges | Type, position, cup boring and whether hinges are concealed or visible. |
| Drawer configuration | Separate or false fronts, attached fronts, box material and runner condition. |
| Irregular pieces | Angled doors, corner units, appliance panels and unusually deep fronts. |
| Hardware | Handles, knobs, hinges and runners you hope to reuse or replace. |
Why overlay and hinge details matter
Overlay describes how much of the cabinet frame or opening a closed door covers. A small change in overlay can affect the gap between neighbouring doors, the position of handles and whether doors clear adjacent walls or appliances.
Concealed hinges also need compatible cup boring and placement. If the new door uses a different hinge position, the installer may need to drill new holes or replace the hinges. Record the current arrangement instead of assuming that existing hardware will transfer.
A simple preparation routine
- Take wide photographs from several angles.
- Take close-ups of chipped, swollen, cracked, warped or mismatched pieces.
- Count doors and drawers separately.
- Label components on a sketch or photograph, especially corner and irregular units.
- Record your preferred style, colour, sheen and hardware direction.
- Share your city and whether you want refinishing, refacing or help deciding.
Provide wide photographs, close-ups of damage, door and drawer counts, your location and the preferred colour or style with the first quote request. Unusual dimensions or condition issues may still require an in-person assessment.
Drawer Fronts Need Their Own Check
A drawer front is the visible panel you pull. The drawer box is the container behind it. Replacing the front improves the appearance of a sound drawer, but it does not repair a swollen, loose, cracked or misaligned box.
Some cabinets use a working drawer with a separate front. Others use a false front, commonly at a sink cabinet, where the panel covers the opening without holding a drawer. These configurations require different measurements and installation decisions.
Flag these drawer issues early
- A loose front with a sound box and runners.
- A swollen drawer box that no longer closes squarely.
- A permanently attached front that cannot be separated easily.
- Similar-looking fronts with different heights or runner positions.
- A false front that needs removal and reinstallation.
- Misalignment caused by the box, runners or cabinet opening.
Describe the underlying problem instead of calling every issue a “new drawer front.” A new panel may be enough for a cosmetic update, while a failing box or runner may require repair or replacement.
How the New Fronts Are Coordinated

Successful replacement depends on matching more than colour. The new doors and drawer fronts need to relate to the cabinet openings, overlay, hinge boring, thickness, hardware and surrounding panels.
Before approving the design, settle these points:
- Door and drawer-front profile.
- Dimensions and overlay for each opening.
- Hinge type, boring and placement.
- Colour and sheen, approved using a physical sample when possible.
- End panels, fillers, toe kicks and other exposed surfaces.
- Handle placement and whether existing hardware will be reused.
- Drawer-box and runner repairs that need to happen before installation.
Colour can look different under showroom lighting, daylight and kitchen fixtures. A physical sample gives you a more useful comparison with the countertop, backsplash, flooring and appliances than a screen alone. The refacing and refinishing answers cover related material and process questions.
What a Professional Front-Replacement Project Includes
A professional project connects the design decision to the finished kitchen instead of treating doors as isolated parts. Exact inclusions belong in the written quote, but the customer journey usually includes these stages.
- Initial review: Provide photographs, counts, location and the desired look.
- Scope confirmation: Separate new fronts from refinished surfaces, trim, end panels, hardware and repairs.
- Measurement verification: Confirm openings, overlays, hinge details, drawer configurations and irregular pieces.
- Removal and labelling: Remove and identify existing components so each piece returns correctly.
- Preparation: Clean, sand and assess surfaces before finishing or installation.
- Front coordination: Match the new fronts to the agreed style, colour, layout and visible details.
- Installation: Install, align and adjust components and hardware.
- Inspection: Review alignment, consistency and the agreed scope.
Timing depends on component count, preparation, new-front requirements and finish details. A universal schedule should not be assumed. Learn more about professional cabinet refacing when comparing service scopes.
Budget for the Whole Scope, Not Just the Fronts
Many P2D refinishing and refacing projects fall between $3,000 and $8,500 CAD. This is a planning range, not a fixed price for every refacing project.
Cost is influenced by the number of doors, drawer fronts and panels; cabinet condition; preparation; new-front requirements; colour and sheen; end panels, fillers and toe kicks; hardware; drawer repairs; removal; installation and alignment.
Because new doors and drawer fronts add components and installation work, refacing generally costs more than refinishing suitable existing fronts. It can still avoid the demolition and construction involved in replacing cabinet boxes. Review the main cabinet refacing cost factors by comparing scope line by line.
Prepare the Kitchen and Compare the Quote
Remove fragile items, clear countertops where requested and plan for temporary loss of frequently used dishes or food while doors and drawers are off the cabinets.
Before approving a quote, ask whether it identifies:
- Every door, drawer front, panel, filler, trim piece and box included.
- Whether the work is refinishing, refacing, selected replacement or a combination.
- Measurements, overlays, hinge boring and drawer configurations.
- Removal, labelling, installation, alignment and inspection.
- New or reused hardware, runners and soft-close changes.
- Repairs to damaged drawer boxes, cabinet boxes or moisture-affected areas.
- Colour approval, sheen, samples and adjacent surfaces.
- Timing, access, cleanup, payment milestones and warranty terms.
P2D states that it offers a five-year workmanship warranty and a lifetime colour warranty. Ask for the applicable scope in writing, especially if the project includes new components, hardware or repairs.
Questions Homeowners Ask Before Ordering New Fronts
Can I keep my cabinet boxes?
Yes, if they are sound, dry, securely installed and part of a functional layout. Damaged boxes, poor clearances or a layout needing redesign may require a larger renovation.
What should I photograph and count?
Take wide photographs, close-ups of damage, separate door and drawer counts, and notes about colour, style, false fronts, end panels and hardware problems.
Can a new drawer front fix a damaged drawer box?
Not always. A swollen or cracked box, runner or cabinet opening may need separate repair or replacement.
Can I reuse existing hardware?
Sometimes. Handles may transfer if their placement suits the new fronts. Hinges and drawer hardware depend on dimensions, overlay and configuration.
How should I compare quotes?
Compare components, measurements, preparation, box and trim finishing, hardware, installation, alignment, cleanup, timing and warranty terms. A lower total may omit panels, repairs or reinstallation.
A Clear Next Step for Your Toronto Kitchen
Gather wide and close-up photographs, count your doors and drawers, note box or drawer damage, and record the style and colour you want. If the layout works but the visible fronts no longer do, request a free, no-obligation quote from P2D Refinishing with a scope that separates new doors and drawer fronts from refinishing, repairs and hardware work through its cabinet refacing service.

